Provided Services
- General conversion/upgrading of the main switchboard by design, supply and installation of a modern power management system (DEIF) after diesel generators replacement. All switchboard’s auxiliaries were replaced with new of microprocessor, sophisticated type.
- All door analogue indicators, controls, pilot lights etc. replaced with new.
- Main Switchboard Indication and control greatly enhanced by the use of touch screens HMI where the principles of safety, simplicity and easy handling have been followed.
- Replacement of all the high Amps circuit breakers at the main switchboard.
- Totally rebuilt of the Wheel House after total destruction by fire:
- - Design and construction of new console.
- - Design and construction of the damage control station.
- - Installation of the GMDSS console.
- - Installation of all the new integrated Wheel House Systems (STN Atlas).
- - Installation of all the safety systems (fire alarm, Firedoors, Water tight doors, Public Address, General alarm, VDR, CCTV, etc.)
- - Installation of all the Main Engines and Propulsion remote control systems.
- - Installation of the steering gear remote control and alarms system.
- - Installation of all the internal communication systems equipment.
- - Installation of all the antennas and the radio communication systems.
- - Installation of all the stabilizers control system.
- Prepare of all the cabling, equipment, lights and secondary switchboards installation for the Galley spaces major refit.
- Prepare of all the cabling, equipment and secondary switchboards installation for the Laundry spaces major refit.
- Prepare of all the cabling, equipment, lights and secondary switchboards installation for the Crew spaces major refit.
- Installation of new shore connection box.