Provided Services
- Installation of a new Integrated Control, Alarm and Monitoring System:
- -Installation of central PLC units of the Group Schneider M580 Platform collecting and processing all the involved information.
- -Installation of one SCADA stations at the E.C.R.
- -Installation of a wide network of high definition touch screens as HMI.
- -Installation of a wide network of Data collection I/O panels.
- -Main and auxiliary engines as well all engine room auxiliary systems monitored and controlled by the new ICAMS.
- Total replacement of Heating, Ventilation and Air Condition Control Systems for the accommodation spaces. The system acts as an integral part of the ICAMS.
- -New PLC central processing panels based at the Group Schneider M340 Platform installed throughout the ship with independent temperature control and monitoring touch screens, at least one per space.
- -Air handling units’ control and monitoring functions integrated to the new system.
- -Dampers control system.
- Replacement of the Power Management System. New system is based at the Group Schneider M580 Platform. Dedicated touch screen is provided for HMI.