.
.
.
project-item-three
SETE YACHTS (145m LOA)

MY ALEXANDER

projects-filter-icon.svg projects-filter-icon-close.svg

Provided Services

  • Complete Replacement of the main switchboard:
  • - Installation of new Sophisticated power Management System.
  • - Replacement of all the generators’ and consumers’ circuit breakers with new of the Draw-out and plug in type.
  • - Replacement of all the analogue indicators, pilot lights and control buttons and switches.
  • - Control is implemented in a fully automated way through high definition Touch Screens.
  • - Replacement of the Bus Bars System.
  • Replacement of the Emergency Generator Switchboard with new of the fully automated type.
  • Complete replacement of the Ship’s Transitional Source by installing new UPS units on a duplicated back to back synthesis. UPS power capacity 2 x 30KVA.
  • Installation of a new Integrated Control, Alarm and Monitoring System:
  • - Replacement of the Engine Control Room Console.
  • - Installation of central PLC units of the Group Schneider M340 Platform collecting and processing all the involved information.
  • - Installation of one SCADA station at the E.C.R.
  • - Installation of a wide network of high definition touch screens as HMI.
  • - Installation of a wide network of Data collection I/O panels.
  • - Main and auxiliary engines as well all engine room auxiliary systems monitored and controlled by the new ICAMS.
  • Installation of a new Tank Monitoring System by supplying new tank level sensors, relative wiring and automation. Tank monitoring integrated to the ICAMS.
  • Installation of new Shore connection box, 1000Amps capacity with new power and auxiliary cabling and dock side station. Both ship and dock side panels include air circuit breakers and suitable control and monitoring automation.
  • Complete replacement of the reefer compressors and reefer chambers control and monitoring system.
  • - New panels, PLC automation, motor starters and temperature controllers installed.
  • - Dedicated touch screens installed at all the operating stations.
  • - The system integrated to the ICAMS.
  • Certain Number of engine room secondary switchboards and motor control starters replacement.
  • Prepare all the installations for the Ballast Sea Water Treatment System.

Fields of Expertise

1

DESIGN, STUDIES FOR ELECTRICAL SYSTEMS, CONSULTING SERVICES

2

MAIN, EMERGENCY AND AUXILIARY SWITCHBOARDS CONSTRUCTION

3

E.C.R. OR WHEEL HOUSE CONSOLES CONSTRUCTION

4

POWER MANAGEMENT SYSTEMS

5

INTEGRATED CONTROL, ALARM & MONITORING SYSTEMS

6

SAFETY SYSTEMS INSTALLATIONS

7

COMPLETE OR PARTIAL POWER & CONTROL CABLING INSTALLATIONS

8

MOTOR DRIVE INSTALLATIONS

TECHNICAL HARMONY

SETTING SAIL FOR EXCELLENCE IN EVERY ENDEAVOR

CONTACT US