Provided Services
- Installation of a new Integrated Control, Alarm and Monitoring System:
- - Partly Replacement of the Engine Control Room Console.
- - Installation of central PLC units of the Group Schneider M580 Platform collecting and processing all the involved information.
- - Installation of two SCADA stations at the E.C.R.
- - Installation of a wide network of high definition touch screens as HMI.
- - Installation of a wide network of Data collection I/O panels.
- - Main and auxiliary engines as well as all engine room auxiliary systems monitored and controlled by the new ICAMS.
- Installation of new Shore connection box, 4000Amps capacity with new power and auxiliary cabling and dock side station. Both ship and dock side panels include air circuit breakers and suitable control and monitoring automation. Replacement of the main switchboard Shore Air Circuit breaker and its operation automation circuits.
- Complete replacement of the Ship’s Transitional Source by installing new UPS units on a duplicated back to back synthesis. UPS power capacity 2 x 140KVA.
- Replacement of all the 4pcs Screw Type Air Conditions compressor units control panels with new of the most modern using powerful PLC units and local touch screens. The system integrated to the central ICAMS.
- Replacement of the circuit breakers and the bus bars system from certain sections of the main switchboard.
- Replacement of the Air Compressors control starter panels.